AI for fit-out contractors

Fit-out runs fast, in someone else's building, with a client in the next room and a handover date that does not move. The documentation problem is rarely volume alone: it is producing records at the pace of the programme and assembling a handover pack from work that finished weeks ago.

The documentation load

The documentation load in fit-out

Permits and records generated daily, and a handover pack assembled at the end from all of it.

01

Working in occupied buildings

Method statements covering noise, dust, access and the interface with people using the building, plus the daily records showing what was agreed with the building manager.

02

Hot works permits

Issued, monitored and closed out, with fire watch arrangements recorded. A permit closed on paper but not in practice is a serious finding.

03

O and M manuals

Assembled at the end from information produced throughout, by subcontractors who have already moved to the next job.

04

Snagging and handover

Lists that grow, get reissued, and have to be demonstrably closed before the client accepts the space.

Where AI helps

What comes off your team

Repetitive, document-shaped work, applied inside the way your firm already works.

Produced and checked automatically

  • Check method statements for work in occupied premises against your own templates
  • Check a permit has the fire watch and close-out arrangements it references
  • Build the daily record from what the supervisor captured on the floor
  • Assemble handover information from records captured as the work happened

Which modules are live

Site Diaries, RAMS Assurance and Subcontractor Onboarding are live on UK construction sites with a small number of contractors.

Inspections and Quality, Progress Reporting and Handover Packs are in development. We do not describe a module as live until it is running on a real site.

Where the line sits

What stays with competent people

AI drafts, checks and flags. People decide, and the accountability does not move.

  • Permit issue and close-outA hot works permit is issued and closed by a person who takes responsibility for the fire watch.
  • Acceptance of the spaceWhether a snag is closed, and whether the space is ready, is a judgement.
  • Client agreementsWhat was agreed with the building manager is a conversation, recorded afterwards.
  • Every CDM 2015 dutyUnchanged.

Common questions

Questions we hear in fit-out

How can construction firms use AI to cut admin?

Construction firms cut admin with AI by applying it to the documents they already produce every week, not by replacing the people who produce them. The work that responds best is repetitive and document-shaped: site diaries written from spoken notes, subcontractor packs checked for missing insurances and expired cards, RAMS cross-checked for conflicts and gaps before a competent person signs them off, and progress records assembled from what was already captured on site. Aldbry applies AI inside your existing workflows rather than asking you to move to a new platform, and a competent person reviews and signs off every output. If you want to size the problem before spending anything, the Construction Admin Cost Calculator gives you a headline figure in a couple of minutes.

How do you check a subcontractor RAMS pack?

Read the pack as one submission and compare the documents against each other, because that is where the real problems sit. The checks that matter are the figures that must agree across documents, plant and substances that need a matching assessment somewhere in the pack, controls that are missing from the document where they count, references and revisions that do not line up, and sign-offs that are absent or out of date. Aldbry does this as a managed service and inside Corvleo, and the output is an evidenced review sheet rather than a verbal opinion, so you can show what was checked. The decision to accept the pack stays with your competent person.

Is it safe to use AI on RAMS and safety documents?

Yes, provided AI checks and flags while competent people write, review and sign off. AI is good at finding missing sections, inconsistent figures, expired certificates and requirements that have not been addressed, and it does not get tired at the end of a long pack. It is not a competent person and should never be treated as one. Aldbry designs every workflow so that a named person approves the output, and Corvleo presents findings for review rather than issuing decisions. Accountability under CDM 2015, LOLER 1998, COSHH 2002 and your other duties stays exactly where it sits today.

Can it help assemble an O and M manual?

Handover Packs is in development rather than live, so today the help is upstream: capturing the information properly as the work happens, so the pack is assembled from records that already exist rather than chased from subcontractors who have left. Site Diaries and Subcontractor Onboarding are live and do that capture. We will not describe a module as live until it is running on a real site.

We work in occupied buildings. Does that change anything?

It raises the value of the daily record, because most disputes in occupied fit-out are about what was agreed, when, and what condition something was in. A record built on the floor with photographs, before the supervisor leaves, is worth considerably more than one written up later. The controls themselves, and what is agreed with the building manager, stay with your people.

Next step

Try it on one live fit-out package.

The free RAMS pack check reviews one subcontractor pack and sends the findings back. Or book a short call about the records your work generates each week.

Free pack check Book a call